PPS drawing
BuiltWithNOF1

 

Reservoir Gallery 1

View showing the construction with the brick pillars

View showing the construction with the brick pillars

View showing the construction with the brick pillars and valted roof.
All the loose brick are from the access (Meter Room) tower that was on the top outside
this was demolished for security reasons years ago and the bricks pushed down inside
Plans are to rebuild the 'Meter Room'
as one of the entry points to the reservoir.

[PPS Main Page] [Dates & Times] [Contact Info] [Membership] [Experience Steam] [Road Map] [Main Station] [Site Photos] [Water History] [Facts & Figures] [Projects] [Movies] [1879 Reservoir 1] [Reservoir 1] [1879 Reservoir 2] [PPS Boats] [Restoration] [Re-Opening 2005] [Links 1] [Links 2] [Disclaim]